DPU Street Work Week of
Oct. 18, 2021
*Completion estimates
and closings are weather permitting
For emergency closings
and daily locations, follow @DPUstreetnews on Twitter
First District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
6500-6900 blks Three Chopt
Road from Honaker to Kensington |
Sewer main installation |
Bandy Field |
Northbound lane closed from Honaker to Kensington |
28 days |
6213 Tapoan Road |
Sewer mainline replacement |
Three Chopt |
As needed |
75% complete |
4818 Grove Ave |
Sewer service replacement |
Mary Munford |
As needed |
90% complete |
Portland Place at Queen
Charlotte Road |
Gas main |
Windsor Farms, Carillon |
As needed |
As needed |
200-210 W Hillcrest Ave |
Sewer service replacements |
Lockgreen |
As needed |
15% complete |
Oxford Road at W Oxford
Circle |
Gas services |
Windsor Farms |
As needed |
As needed |
Oxford Road at Coventry
Road |
Paving, box removal |
Windsor Farms |
As needed |
As needed |
3310 W Franklin St |
Sewer service replacement |
Museum District |
As needed |
87% complete |
4401 W Broad St |
Sewer service replacement |
Sauer’s Garden |
As needed |
95% complete |
4309 Coventry Road |
Gas services |
Windsor Farms |
As needed |
As needed |
Second District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
222 W Marshall St |
Steel plates over Collapsed
storm drain for DPW |
Jackson Ward |
Steel plates |
As needed |
100 blk N Plum St |
Sewer service replacement |
The Fan |
As needed |
88% complete |
400 blk N Shields Ave |
Sewer service replacement |
The Fan |
As needed |
Scheduled to start |
N Harrison at W Clay St |
Gas main |
Carver |
As needed |
As needed |
Norton St at Catherine St |
Paving |
Carver |
As needed |
As needed |
Third District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
3000-3100 Woodrow Ave |
Sewer main installation |
Brookland Park |
Eastside alley closed |
175 days |
3rd St at Cypress
alley |
Gas main |
Highland Park Southern Tip |
As needed |
As needed |
North Ave at Essex |
Gas main |
Northern Barton Heights |
As needed |
As needed |
2817 North Ave to Porter |
Gas renewal service |
Northern Barton Heights |
As needed |
As needed |
2600 blk 5th Ave |
Sewer service installation,
point repair, MH installation |
Highland Park Southern Tip |
As needed |
35% complete |
900 blk Young St |
Excavation work |
North Highland Park |
Closed |
All week |
Fourth District
Location
|
Work
|
Area Impacted
|
Traffic Control
|
Days Closed
|
1000 blk W 47th St
|
Sewer replacement
|
Forest Hill Terrace
|
Closed to thru traffic
|
30 days
|
Blakemore Road at Junaluska
|
Water main
|
Westlake Hills
|
As needed
|
As needed
|
3830 Wainfleet Drive
|
Drainage improvements
|
Huguenot
|
As needed
|
64% complete
|
Fifth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
W 19th at
Bainbridge |
Gas main |
Swansboro |
As needed |
As needed |
2301 Amelia St |
Removing failing storm
line, cavitation and installing storm system area restoration |
Byrd Park Maintenance Shop |
As needed |
52% complete |
600 blk W 27th
St |
Paving |
Woodland Heights |
As needed |
As needed |
W 27th at Semmes |
Paving |
Woodland Park |
As neeed |
As neeed |
Sixth
District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
14th St at Mayo
Bridge |
Water main |
Downtown, Old Town
Manchester |
As needed |
As needed |
1200 blk E Byrd St
Hollywood interceptor |
Emergency mainline repair |
Downtown Shockoe Slip |
As needed |
86% complete, ongoing
monthly pumping |
Seventh District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
N 30th at T St |
Gas main |
Woodville, Church Hill
North |
As needed |
As needed |
3100 blk E Main St |
Libby Hill |
Sewer main replacement |
As needed |
Scheduled to start |
Fairfield at Cool Lane |
Gas main |
Fairfield, Eastview |
As needed |
As needed |
N 28TH at T St |
Cavitation repair |
Church Hill North |
As needed |
80% complete |
Nine Mile Road at N 30th |
Gas main |
Creighton |
As needed |
As needed |
Q St at N 33rd
St |
Gas main |
Church Hill North |
As needed |
As needed |
Fairfield at Creighton Road |
Gas main |
Creighton |
As needed |
As needed |
Eighth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
2800-A North Hopkins Road |
Service replacement, tie-in |
Maury |
As needed |
Scheduled to start pending
on-site inspection |
1424 Bainbridge St |
Sewer service replacement |
Blackwell |
As needed |
As needed |
Ninth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
Worthington Road |
asphalt |
Worthington |
As needed |
As needed |
4221 Dorset Road |
Sewer service replacement |
Cottrell Farms |
As needed |
Scheduled to start |
Andros Road |
Testing, asphalt |
Worthington Farms |
As needed |
As needed |
Holiday Road |
paving |
Worthington Farms |
As needed |
As needed |