DPU Street Work Week of
May 2, 2022
*Completion estimates
and closings are weather permitting
For emergency closings
and daily locations, follow @DPUstreetnews on Twitter
First District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Radford Ave
betw Blacker Ave and Chantilly St |
Gas main |
Monument Ave
Park |
As needed |
As needed |
4716 W
Franklin St |
Emergency
sewer service replacement |
Willow Lawn |
As needed |
95% complete |
4611 Radford
Ave |
Gas services |
Monument Ave
Park |
As needed |
As needed |
4200 blk
Augusta Ave |
Sewer repairs |
Sauer’s
Garden |
Closed during the day |
All week |
4800
Lockgreen Circle |
Services, Manifold,
light up |
Lockgreen |
As needed |
As needed |
Second District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
1107-1125
Grove Ave |
Sewer service
replacements |
VCU, The Fan |
As needed |
15% complete |
900 blk W
Clay St |
Gas services |
Carver |
As needed |
As needed |
400 N Madison
St |
Sewer
mainline repair |
Jackson Ward |
As needed |
82% complete |
Catherine St
at Hancock Ave |
Gas main |
Carver |
As needed |
As needed |
Third District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
3000-3100
blks Woodrow Ave |
Sewer main
construction in alley |
Brookland
Park |
Eastside alley closed |
30 days |
3860 Fauquier
Ave |
Pipe
installation and back area grade stone in alley |
Bellevue |
As needed |
80% complete |
1602 Laburnum
Park Blvd |
Sewer service
replacement |
Laburnum Park |
As needed |
90% complete |
3015 Garland
Ave |
Sewer service |
Brookland
Park |
As needed |
95% complete |
3rd
St at Willow |
Gas services |
Highland Park
Southern Tip |
As needed |
As needed |
807 Lincoln
Ave |
Sewer service
replacement |
Washington
Park |
As needed |
90% complete |
3600 Noble
Ave |
Sewer service
replacement |
Ginter Park |
As needed |
90% complete |
800 blk W
Brookland Park Blvd to 3000 blk Chamberlayne Ave and W Ladies Mile Road |
Milling and
paving |
Ginter Park
Terrace |
Closed 8 am to 8 pm |
Monday-Wednesday |
Fourth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Blakemore
Road at Junaluska Ct |
asphalt |
Westlake
Hills |
As needed |
As needed |
3016 Wighton
Drive |
Sewer service
replacement |
Huguenot |
As needed |
85% complete |
4019
Monticello St |
Sewer service
replacement |
Bellevue |
As needed |
90% complete |
7507 Turf
Lane |
Culvert replacement
and cavitation repairs |
Southhampton |
As needed |
97% complete |
5000, 5204
Devonshire Road |
Sewer service
replacements and mainline repair |
Westover
Hills |
As needed |
90% complete |
Fifth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
59 W
Pilkington St |
Milling,
paving, topsoil installation |
Swansboro |
As needed |
90% complete |
3314 W Cary
St |
Sewer
replacement |
Carytown |
As needed |
45% complete |
3203
Douglasdale Road |
Sewer
replacement |
Carillon |
As needed |
85% complete,
on hold due to emergencies elsewhere |
W 27th,
W 28th, W 29th, W 30th |
Paving around
area |
Woodland
Heights |
As needed |
As needed |
606 W 30th |
Gas services |
Woodland
Heights |
As needed |
As needed |
Sixth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
200 blk N 9th St |
Manhole rehab |
Capitol Square |
As needed |
65% complete. |
N 7th
St betw Hospital and Jackson |
Bridge
replacement |
Court End,
Upper Shockoe Valley, Whitcomb |
Southbound lanes closed. Follow marked
detours. |
TBD |
Oliver Hill
Way |
Milling, water
main |
Upper Shockoe
Valley |
As needed |
As needed |
S 14th
at Mayo Bridge |
Steel plates
over old vaults in sidewalk |
Old Town
Manchester, Shockoe Bottom |
As needed |
As needed |
Seventh District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
1509 E Main
St |
Exploratory
dig |
Shockoe Slip |
As needed |
30% complete |
1410 N 32nd
St |
Mainline
point repair and sewer service replacement |
Church Hill
North |
As needed |
Lateral
repair complete, 15% of mainline point repair |
N 27th
at Tate St |
Gas main |
Woodville |
As needed |
As needed |
3200 blk Q St |
Sewer repairs |
Church Hill
North |
Closed during day |
All week |
Eighth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
4130 Terminal
Ave |
Sewer service
replacement |
Hickory Hill |
As needed |
96% complete |
Gunn St |
Water main |
Bellmeade |
As needed |
As needed |
Goolsby Ave
at Remuda Drive |
Gas line
renewal |
Bensley |
As needed |
As needed |
Ninth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Montague Road |
Flushing,
chorinating |
Worthington
Farms |
As needed |
As needed |
Clearfield St
at Snead Road |
Gas main |
Piney Knolls |
As needed |
As needed |