DPU Street Work Week of
April 18, 2022
*Completion estimates
and closings are weather permitting
For emergency closings
and daily locations, follow @DPUstreetnews on Twitter
First District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Lock Green
Circle at Lockgreen Place |
asphalt |
Wilton |
As needed |
As needed |
Radford Ave
betw Blacker Ave and Westmoreland Ave |
Gas main |
Monument Ave
Park |
As needed |
As needed |
Gun Club Road
betw Dover and Queen Charlotte |
Gas main |
Windsor Farms |
As needed |
As needed |
4716 W
Franklin St |
Emergency
sewer service replacement |
Willow Lawn |
As needed |
95% complete |
6505-6514
Hanover Ave |
Emergency
sewer service replacements |
Three Chopt |
As needed |
90% complete |
Portland
Place at Tomacee Road |
paving |
Windsor Farms |
As needed |
As needed |
9000 blk
Chantilly St |
Sewer repairs |
Monument Ave
Park |
Closed |
All week
during day |
Second District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
1107-1125
Grove Ave |
Sewer service
replacements |
VCU, The Fan |
As needed |
15% complete |
900 blk W
Clay St |
Gas services |
Carver |
As needed |
As needed |
211 N Foushee
St |
Replace three
sewer lateral connections |
Jackson Ward |
As needed |
85% complete |
400 N Madison
St |
Sewer
mainline repair |
Jackson Ward |
As needed |
15% complete |
Catherine St
at Hancock Ave |
Gas main |
Carver |
As needed |
As needed |
Third District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
3000-3100
blks Woodrow Ave |
Sewer main
construction in alley |
Brookland
Park |
Eastside alley closed |
25 days |
3860 Fauquier
Ave |
Pipe
installation and back area grade stone in alley |
Bellevue |
As needed |
80% complete |
1602 Laburnum
Park Blvd |
Sewer service
replacement |
Laburnum Park |
As needed |
90% complete |
3015 Garland
Ave |
Sewer service |
Brookland
Park |
As needed |
95% complete |
3rd
St at Chestnut Ave |
Gas services |
Highland Park
Southern Tip |
As needed |
As needed |
500 blk E
Ladies Mile Road |
Top hat
installation |
Providence
Park |
Closed |
Wednesday |
1001
Fourquerean Lane |
CIPP short
liner installation |
Highland
Terrace |
Closed |
Thursday |
807 Lincoln
Ave |
Sewer service
replacement |
Washington
Park |
As needed |
90% complete |
3600 Noble
Ave |
Sewer service
replacement |
Ginter Park |
As needed |
25% complete |
116 Overbrook
Road |
Gas service |
Northern
Barton Heights |
As needed |
As needed |
3600 blk
North Ave |
Lane closures
for top hat installation |
Edgewood |
Closed |
Tuesday |
Fourth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Blakemore
Road at Hagueman |
Water main |
Westlake
Hills |
As needed |
As needed |
3016 Wighton
Drive |
Sewer service
replacement |
Huguenot |
As needed |
85% complete |
4019
Monticello St |
Sewer service
replacement |
Bellevue |
As needed |
90% complete |
900 blk
Forest View Drive |
Excavation
work |
Forest View |
Closed |
Wednesday-Friday |
5600 blk
Jahnke Road |
Lane closure for
tophat installation; excavation work |
Westover |
Lane closures on Monday, road closure
Mon-Tues |
Monday-Tuesday |
7507 Turf
Lane |
Culvert
replacement and cavitation repairs |
Southhampton |
As needed |
65% complete |
N Junaluska
Drive |
Water services |
Westlake
Hills |
As needed |
As needed |
Fifth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
59 W
Pilkington St |
Milling,
paving, topsoil installation |
Swansboro |
As needed |
90% complete |
2708, 2815
Semmes Ave |
Sewer service
|
Woodland Park |
As needed |
85-90%
complete |
3314 W Cary
St |
Sewer
replacement |
Carytown |
As needed |
45% complete |
600 blk W 29th
St |
Gas services |
Woodland
Heights |
As needed |
As needed |
3200 blk
Douglasdale Road |
Sewer repairs |
Carillon |
Closed |
All week |
Sixth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
200 blk N 9th St |
Manhole rehab |
Capitol Square |
As needed |
60% complete. |
N 7th
St betw Hospital and Jackson |
Bridge
replacement |
Court End,
Upper Shockoe Valley, Whitcomb |
Southbound lanes closed. Follow marked
detours. |
April 25-TBD |
S 5th
at E Byrd St |
Water main
retirement, asphalt |
Gambles Hill |
As needed |
As needed |
Seventh District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
520 N 33rd
St |
Emergency
sewer service replacement |
Church Hill
North |
As needed |
85% complete |
N 33rd St at
T St |
Paving |
Church Hill
North |
As needed |
As needed |
1400 N 32ND
sT |
Sewer repairs |
Church Hill
North |
Closed |
All week
during the day |
Eighth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
4130 Terminal
Ave |
Sewer service
replacement |
Hickory Hill |
As needed |
96% complete |
4320 Commerce
Road |
Lateral
lining sewer service replacement |
Bensley |
As needed, waiting for lining to begin |
50% complete |
Gunn St |
Water main |
Bellmeade |
As needed |
As needed |
Ninth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Montague Road |
Water main
testing |
Worthington
Farms |
As needed |
As needed |