Friday, March 1, 2024

Lane Closure – South Belvidere Street and Downtown Expressway

 

Traffic Advisory

March 1, 2024

Contact: Lux Aghomo

Office: 804.646.5711

 

Lane Closure – South Belvidere Street and Downtown Expressway

WHO: City of Richmond Department of Public Works (https://twitter.com/DPW_RichmondVA) 
 
WHAT: Street Closure, Daily

WHEN: See below

WHERE: In the 5th Voter District

  • The eastbound entrance to Byrd Street intersecting South Belvidere Street adjacent to Idlewood Avenue. (Red line marks location)
    • Date and Time: Monday, March 4 to Thursday, March 7 from 8:30 a.m. to 4 p.m.
  • The 2nd Street offramp from eastbound downtown expressway to Byrd Street (Orange X marks location)

    • Date and Time: Monday, March 4 to Wednesday, March 6 from 10 a.m. to 4 p.m.

 

 

BACKGROUND: In the area listed above the contractor will be installing a storm water pipe to upgrade the pedestrian crossing. Vehicles will be detoured during the closure hours.

 

###

 

The City of Richmond Department of Public Works (DPW) is one of only 195 currently accredited public works agencies in the United States. DPW’s portfolio comprises a wide array of services to include leaf collection; street, sidewalk and alley maintenance; trash collection; recycling; grass cutting;  graffiti removal; parking enforcement; urban forestry; street signs; traffic signals and pavement markings and civil engineering. In addition, DPW maintains upkeep on most city buildings; issues permits for working in the city’s right-of-way; manages the RVA Bike Share program and maintains the fleet of city vehicles. DPW’s operating budget comes from the general fund of the City of Richmond.  For more information about DPW services, click here or call 3-1-1