DPU Street Work Week for
Week of Oct. 24, 2022
*Completion estimates and closings are weather permitting
For emergency closings and daily locations, follow
@DPUstreetnews on Twitter
First District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Westview Ave |
Water testing
and paving |
Westhampton |
As needed |
As needed |
5811 Guthrie
Ave |
Curb and
gutter improvements |
Three Chopt |
As needed |
90% complete |
4900 blk W
Franklin St |
Sewer service
replacement |
Willow Lawn |
As needed |
75% complete |
903 Regester
Parkway |
Gas main |
Three Chopt |
As needed |
As needed |
Second District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Park Ave at N
Arthur Ashe Blvd |
Cavitation
repairs for drainage |
The Fan,
Museum District |
Eastbound lane of Park Ave closed as
needed |
10-15 days |
Goshen at
Catherine St |
Water main |
Carver |
As needed |
As needed |
947 Myers ST |
Milling and
paving |
Diamond
District |
As needed |
75% complete |
W Grace St at
N Monroe |
DPW work |
Monroe Ward |
Lane closures |
Through Oct.
28 |
Third District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
3400 blk
Griffin Ave |
Sewer main
replacement |
Edgewood |
Closed during the day |
14 days |
Moss Side
Avenue |
Water main |
Ginter Park |
As needed |
As needed |
1500-1600 blks
Front St |
Sewer main
and service replacement |
North
Highland Park |
Closed to thru traffic |
30 days |
1st at
Chestnut |
Water
services in alley |
Highland Park
Southern Tip |
As needed |
As needed |
3800 blk
Chamberlayne Ave |
Sewer repairs |
Ginter Park |
As needed |
60% complete |
Chamberlayne
Ave at Lombardy |
DPW installing
curb ramps and traffic signals |
Virginia
Union, North Barton Heights |
Lane closures |
Through Oct.
28 |
2909
Northumberland Ave |
Sewer service
replacement |
Virginia
Union, North Barton Heights |
As needed |
50% complete |
3900 blk
Monticello St |
Sewer work |
Bellevue |
Closed |
Monday |
3rd
at Cypress |
Water
sampling |
Highland Park
Southern Tip |
As needed |
As needed |
Fourth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Blakemore
Road |
Paving |
Westlake
Hills |
As needed |
As needed |
Fifth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
E Cary at
Foushee |
DPW
installing wheelchair ramps, sidewalk repairs |
Monroe Ward |
Lane closures |
Through Oct.
28 |
3300 blk
Decatur St |
CIPP
installation |
Broad Rock |
Decatur closed betw 34 and Broad Rock
with detour at 34th, eastbound Midlothian closed betw 28th
and 30th |
Monday-Tuesday |
100 blk E 29th
St |
Inliner |
Reedy Creek |
Closed |
Monday |
1000 blk
Idlewood Ave |
Excavation
and restoration |
Oregon Hill |
Westbound lane betw Cherry St and the
roundabout closed with detour at Cherry |
Monday-Thursday |
3000 blk
Stockton St |
Inliner |
Broad Rock |
Swansboro closed betw Stockton and
Decatur, Decatur closed betw 31st and Playin St |
Tuesday-Wednesday |
3400 blk E
Broad Rock Blvd |
CIPP installation |
Broad Rock |
Eastbound Broad Rock closed betw 36th
and Holly Springs Ave |
Tuesday |
3700 blk
Decatur St |
CIPP lining |
Broad Rock |
Road closed at the end of Decatur |
Wednesday |
2000 blk W
Cary St |
Water work |
The Fan |
Closed daily |
All week |
E Broad Rock Blvd
at Forest Hill |
Gas services |
Reedy Creek |
As needed |
As needed |
S Foushee
Street |
Gas main |
Monroe Ward |
As needed |
As needed |
Sixth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
1301 E Cary
St |
Cobblestone
replacement |
Downton
Shockoe Slip |
As needed |
75% complete |
Seventh District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
2000 blk E
Broad St |
Water main,
paving |
Shockoe
Bottom, Union Hill |
As needed |
As needed |
1500 blk N 30th |
Gas services |
Church Hill
North |
As needed |
As needed |
2000 Carver
St |
Sewer main
replacement |
Fairfield |
As needed |
60% complete |
Fulton area |
DPW is doing
milling and overlay |
Fulton |
Alternating lane closures, 9-6 |
Through Nov.
11 |
Eighth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
1700 blk
Ingram Ave |
Sewer service
replacement |
Oak Grove |
As needed |
85% complete |
Hull St at
Cowardin and Richmond Highway |
DPW
installation curb ramps and traffic signals |
Borders on 5th
and 6th districts, Blackwell, Swansboro |
Daily lane closures as needed, 9-4 |
Through Oct.
28 |
1712 Ingram
Ave |
Sewer service
replacement |
Oak Grove |
As needed |
65% complete |
1300 blk
Columbia St |
Water |
Hillside
Court |
Closed during day |
15% complete,
all week |
Dundas Road |
Gas main
renewal |
Bensley Park |
As needed |
As needed |
Ninth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Whitehead
Road |
Water main |
Worthington
Farms, Pocoshock |
As needed |
As needed |
Whitehead
Road at Derwent |
Gas main |
Pocoshock |
As needed |
As needed |