Monday, September 12, 2022

Public Utilities Street Work for Week of Sept. 12, 2022

 

DPU Street Work Week for Week of Sept. 12, 2022

*Completion estimates and closings are weather permitting

For emergency closings and daily locations, follow @DPUstreetnews on Twitter

First District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Intersection of N Wilton at Matoaka Road

Exploratory dig over mainline

Westhampton

As needed

50% complete

Panorama Drive

Paving

Three Chopt

As needed

As needed

Queen Charlotte

Gas main

Windsor Farms

As needed

As needed

3900 blk Ellwood Ave

Sewer service replacement

Colonial Place

Closed during the day

10% complete, all week

3321 Cutshaw Ave

Sewer service replacement

Museum District

As needed

50% complete

 

Second District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Strawberry St at Floyd Ave

Cavitation repairs

Fan District

As needed

85% complete

2307 Grove Ave

Sewer service replacement

Fan District

2300 blk closed during the day

25% complete, all week


Third District

Location

Work

Area Impacted

Traffic Control

Days Closed*

3rd Ave at Cypress

Water main

Southern Barton Heights

As needed

As needed

3400 blk Griffin Ave

Sewer replacement

Edgewood

Closed during the day

10-45 days

1200-1400 blks Brook Road

CIPP installation

Chamberlayne Industrial Center

Southbound lanes reduced to a single lane for construction work during the day

Tuesday-Friday

600 blk W Lancaster

CIPP installation

Ginter Park

Lancaster closed from Tazewell to Hawthorne

Wednesday


Fourth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Glencove Lane

asphalt

Westlake Hills

As needed

As needed



Fifth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

206 Larne Ave

Sewer service replacement

Reedy Creek, Belt Center

As needed

95% complete

2900 blk Decatur St at Playin

CIPP installation

Broad Rock

Playin St closed between Decatur and Hull

Monday

E Broad Rock between E 34th and E 35th

Excavation work

Broad Rock

Closed with detours onto Stockton

All week

2800 blk Hull St

CIPP installation

Broad Rock

Right lane of westbound Hull St closed betw Tynic and E 29th St

Tuesday

100 blk E 32nd St

CIPP installation

Broad Rock, Swansboro West

Lane shifting

Thursday-Friday

W 30th at Bainbridge

Gas services

Swansboro

As needed

As needed


Sixth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

N 9th St between E Broad and E Grace

Building construction, asphalt, clean up, hydrant removal

Capitol District

Closed

Scheduled to reopen approx. Oct 17. Pedestrian pathway open.

Gunn Street

Asphalt, water services

Bellemeade

As needed

As needed

S 7th St

asphalt

Downtown

As needed

As needed

N 11TH at E Broad

Gas main

Biotech/VCU Health

At night

As needed


Seventh District

Location

Work

Area Impacted

Traffic Control

Days Closed*

3100 blk E Main St

Sewer main replacement

Libby Hill

Eastbound traffic detours from roundabout to Williamsburg Road to Nicholson St. 24 hours a day, while westbound detours to Nicholson to Williamsburg to the roundabout Mon-Fri 9-6.

Through Sept. 26, 5% complete

2000 blk E Broad St

Water main

Shockoe Bottom, Union Hill

As needed

As needed

1418 Oakwood Ave

Sewer service replacement

Oakwood

1400 blk closed during the day

10% complete, all week

 

Eighth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

400 blk Maury St

Cavitation repairs

Old Town Manchester

As needed

Scheduled to start

Lauradale Drive

Gas main

Hickory Hill

As needed

As needed



Ninth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Snead at Clearfield

Water services

Fawnbrook

As needed

As needed

Rutherford Road

Asphalt

Worthington Farms

As needed

As needed