DPU Street Work Week of
July 26, 2021
*completion estimates
and closings are weather permitting
For emergency closings
and daily locations, follow @DPUstreetnews on Twitter
First District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Southbound lane of Three
Chopt from Stewart to Hanover |
Sewer main replacement |
Bandy Field Nature Park |
Closed for construction |
10 days |
Nottingham Road betw
Coventry and Dover |
Gas main |
Windsor Farms |
As needed |
As needed |
Berkshire betw Cambridge
and W Cary |
Paving |
Windsor Farms |
As needed |
As needed |
4100 blk Exeter Road |
Gas services |
Windsor Farms |
As needed |
As needed |
Second District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
222 W Marshall St |
Collapsed storm drain |
Jackson Ward |
As needed |
As needed |
Bowe St at W Leigh |
paving |
Carver |
As needed |
As needed |
Third District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
3200 Garland Ave |
Excavation |
Brookland Park |
Alleyway closed |
All week |
Lamb Avenue |
Gas main |
Northside neighborhoods |
As needed |
As needed |
Overbrook at Brook |
Gas main |
Virginia Union area |
As needed |
As needed |
Fourth District
Location
|
Work
|
Area Impacted
|
Traffic Control
|
Days Closed
|
1000 blk W 47th St
|
Sewer replacement
|
Forest Hill Terrace
|
Closed to thru traffic
|
70 days
|
Old Gun at Huguenot Road
|
Gas main
|
Huguenot
|
As needed
|
As needed
|
Fifth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
Hull St at W 12th |
Gas main |
Blackwell |
As needed |
As needed |
3500 blk Moody Avenue |
Sewer service replacement |
Reedy Creek |
Closed during the day for construction |
5 days |
300 blk W 24th
St |
Gas services |
Swansboro |
As needed |
As needed |
Spring Hill betw W 29th
and W 30th |
Gas main |
Woodland Heights |
As needed |
As needed |
600 blk W 28th
St |
Sewer improvements |
Woodland Heights |
As needed |
Alleyway closed |
4000 blk Dunston Ave |
Sewer construction |
Reedy Creek |
Closed during the day |
All week |
Lawson St betw Broad Rock
Road and W 35th |
Paving |
Swansboro West |
As needed |
As needed |
Broad Rock at Lawson |
Gas main |
Swansboro West |
As needed |
As needed |
Sixth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
None |
|
|
|
|
Seventh District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
U Street betw N 22nd
and N 23rd |
Sinkhole, sewer repair |
Church Hill North |
Closed |
Until Aug. 3 |
Kane St at Creighton Road |
Gas main |
Creighton |
As needed |
As needed |
Kane St at N 29th |
Paving |
Creighton |
As needed |
As needed |
Eighth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
2800-A N Hopkins Road |
Sewer service replacement |
Maury |
During the day as needed |
Scheduled to begin |
Ninth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
McDowell St |
Water main |
Worthington |
As needed |
As needed |
Worthington Road |
Water main |
Worthington |
As needed |
As needed |
Blakemore Road |
Water main |
Worthington |
As needed |
As needed |
6300 blk Hull St |
Asphalt |
Elkhardt |
As needed |
As needed |