Friday, May 28, 2021

Flood Wall Testing Impacts Traffic in 6th, 7th Districts First Week in June

 

Sixth District

Location

Work

Area Impacted

Traffic Control

Days Closed

Brander Street floodwall

Floodwall testing

Brander St entrance to Wastewater Plant and Ancarrow’s Boat Ramp

As needed, follow detours

Tuesday, June 1

7 am to 4 pm

S 12th at E Byrd

Floodwall testing

E Byrd St betw S 12th and Virginia St

As needed, follow detours

Wednesday, June 2

7 am to 4 pm

Goodes St off Commerce Road

Floodwall testing

Manchester

As needed, follow detours

Thursday, June 4

7 am to 4 pm

Mayo Bridge

Floodwall testing

Old Town Manchester, Shockoe Bottom

Bridge closed, southbound end open to island

Saturday, June 5, 7 am to 4 pm

Mayo Bridge

Floodwall testing

Old Town Manchester, Shockoe Bottom

Bridge closed, northbound end open to island

Sunday, June 6, 7 am to 4 pm


Seventh District

Location

Work

Area Impacted

Traffic Control

Days Closed

Dock Street betw 18th and 21st

Floodwall testing

Shockoe Bottom,

As needed, follow detours

Wednesday, June 2

7 am to 4 pm

21st St at Cary

Floodwall testing

E Cary betw S 20th and S 22nd, Shockoe Bottom, Holocaust Museum

As needed, follow detours

Friday, June 4

7 am to 4 pm

Thursday, May 27, 2021

Lane Closure – North Jefferson Street

 

Traffic Advisory
Department of Public Works

Providing a clean, safe and healthy environment

 

 

 

Richmond, Virginia
The Honorable Mayor Levar M. Stoney

cid:image002.gif@01CDF4C1.68BD8A10                                                                                                                                                     

For Immediate Release

May 27, 2021

Media Contact:
Paige Hairston – 804-646-3659 (Office)

                            804-385-0409 (Cell) 

 

 

                                          Lane Closure – North Jefferson Street  

WHO:  City of Richmond Department of Public Works (https://twitter.com/DPW_RichmondVA) 
 
WHAT:  Lane Closure
 
WHEN:  Friday, May 28 through Thursday, June 3 from 9 a.m. to 9 p.m.

WHERE:  North Jefferson between Broad and Franklin streets (6th voter district)

BACKGROUND:  There will be alternating lane closures for paving.   

    

###

 

 

The City of Richmond Department of Public Works (DPW) is one of only 178 currently accredited public works agencies in the United States. DPW’s portfolio comprises a wide array of services to include leaf collection; street, sidewalk and alley maintenance; trash collection; recycling; grass cutting;  graffiti removal; parking enforcement; urban forestry; street signs; traffic signals and pavement markings and civil engineering. In addition, DPW maintains upkeep on most city buildings; issues permits for working in the city’s right-of-way; manages the RVA Bike Share program and maintains the fleet of city vehicles. DPW’s operating budget comes from the general fund of the City of Richmond.  For more information about DPW services, click here or call 3-1-1.

Monday, May 24, 2021

Public Utilities Street Work for Week of May 24, 2021

 

DPU Street Work Week May 24, 2021

*completion estimates and closings are weather permitting

First District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Northbound lane of Three Chopt from Honaker to Hanover

Sewer main replacement

Bandy Field Nature Park

Closed for construction

160 days

Coventry at Nottingham

Gas main

Windsor Farms

As needed

As needed

4700 blk W Franklin

Wastewater

Willow Lawn

Closed during the day

All week

101 Tonbridge Road

Gas services

Windsor Farms

As needed

As needed

Canterbury at Exeter

Paving

Windsor Farms

As needed

As needed


Second District

Location

Work

Area Impacted

Traffic Control

Days Closed

900 Brook Road, Brook at Marshall

Main, dig out for tie-in

Chamberlayne Industrial Center

As needed

As needed

1100 blk W Leigh St

Gas services

Carver

As needed

As needed

Norton at W. Clay

Gas main and testing

Carver

As needed

As needed


Third District

Location

Work

Area Impacted

Traffic Control

Days Closed

None known

 

 

 

 

Fourth District

Location

Work

Area Impacted

Traffic Control

Days Closed

None known

 

 

 

 

 

Fifth District

Location

Work

Area Impacted

Traffic Control

Days Closed

W 25th and W 26th at Stonewall

Gas services, paving

Woodland Heights

As needed

As needed

800 blk Westover Hills Blvd

Sewer service replacement

Forest View

Closed for construction during the day

All week

513 W 25th St

Meter relocation, manifold

Woodland Heights

As needed

As needed

W Cary St at N Thompson

Meter relocation, manifold

Carytown

As needed

As needed

W 27th at Semmes

Gas main

Woodland Park

As needed

As needed





Sixth District

Location

Work

Area Impacted

Traffic Control

Days Closed

None known

 

 

 

 


Seventh District

Location

Work

Area Impacted

Traffic Control

Days Closed

N 30th at Q St

Gas main

Church Hill

As needed

As needed


Eighth District

Location

Work

Area Impacted

Traffic Control

Days Closed

None known

 

 

 

 


Ninth District

Location

Work

Area Impacted

Traffic Control

Days Closed

Blakemore Road

asphalt

Worthington Farms

As needed

Started April 12, 2021

5100 blk Snead Road

Gas services

Piney Knolls

As needed

As needed