DPU Street Work Week of
May 31, 2021
*completion estimates
and closings are weather permitting
For emergency closings
and daily locations, follow @DPUstreetnews on Twitter
First District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed* |
Northbound lane of Three
Chopt from Honaker to Hanover |
Sewer main replacement |
Bandy Field Nature Park |
Closed for construction |
Northbound lane closed all
week |
Coventry at Berkshire |
Gas main |
Windsor Farms |
As needed |
As needed |
107 Tonbridge Road |
Gas services |
Windsor Farms |
As needed |
As needed |
Windsor Way betw Penhurst
and Canterbury |
Paving |
Windsor Farms |
As needed |
As needed |
Windsor Way at Cambridge |
Paving |
Windsor Farms |
As needed |
As needed |
Second District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
Brook at Marshall |
Water main |
Chamberlayne Industrial
Center |
As needed |
As needed |
800 blk W Leigh St |
Gas services |
Carver |
As needed |
As needed |
Kinney St at W Leigh |
Services |
Carver |
As needed |
As needed |
1513 Grove Ave |
Chorinate |
The Fan |
As needed |
Started May 20, 2021 |
Third District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
None known |
|
|
|
|
Fourth District
Location
|
Work
|
Area Impacted
|
Traffic Control
|
Days Closed
|
7000 blk Forest Hill Ave
|
Sewer replacement
|
Gravel Hill
|
Eastbound and westbound traffic reduced to one
lane each way
|
60 days
|
Fifth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
W 25th betw
Semmes and Riverside |
Paving |
Woodland Park |
As needed |
As needed |
606 W 26th St |
Meter relocation, services |
Woodland Park |
As needed |
As needed |
E 32nd St at
Lawson |
Gas main |
Swansboro West |
As needed |
As needed |
W 28th at Semmes |
Saw cutting |
Woodland Park |
As needed |
As needed |
Sixth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
Brander Street floodwall |
Floodwall testing |
Brander St entrance to Wastewater Plant and
Ancarrow’s Boat Ramp |
As needed, follow detours |
Tuesday, June 1 7 am to 4 pm |
S 12th at E Byrd |
Floodwall testing |
E Byrd St betw S 12th
and Virginia St |
As needed, follow detours |
Wednesday, June 2 7 am to 4 pm |
Goodes St off Commerce Road |
Floodwall testing |
Manchester |
As needed, follow detours |
Thursday, June 4 7 am to 4 pm |
Mayo Bridge |
Floodwall testing |
Old Town Manchester,
Shockoe Bottom |
Bridge closed, southbound end open to island |
Saturday, June 5, 7 am to 4
pm |
Mayo Bridge |
Floodwall testing |
Old Town Manchester,
Shockoe Bottom |
Bridge closed, northbound end open to island |
Sunday, June 6, 7 am to 4
pm |
Seventh District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
Dock Street betw 18th
and 21st |
Floodwall testing |
Shockoe Bottom, |
As needed, follow detours |
Wednesday, June 2 7 am to 4 pm |
21st St at Cary |
Floodwall testing |
E Cary betw S 20th
and S 22nd, Shockoe Bottom, Holocaust Museum |
As needed, follow detours |
Friday, June 4 7 am to 4 pm |
2400 Venable St |
Cleanout installation |
Fairmount |
Lane closures |
Tuesday |
Eighth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
1000 blk E 16th
Street |
Wastewater |
Manchester |
Closed during the day |
All week |
Ninth District
Location |
Work |
Area Impacted |
Traffic Control |
Days Closed |
Blakemore Road |
asphalt |
Worthington Farms |
As needed |
Started March 23, 2021 |
5100 blk Snead Road |
Gas services |
Piney Knolls |
As needed |
As needed |