Tuesday, June 1, 2021

Public Utilities Street Work for First Week of June 2021

 

DPU Street Work Week of May 31, 2021

*completion estimates and closings are weather permitting

For emergency closings and daily locations, follow @DPUstreetnews on Twitter

First District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Northbound lane of Three Chopt from Honaker to Hanover

Sewer main replacement

Bandy Field Nature Park

Closed for construction

Northbound lane closed all week

Coventry at Berkshire

Gas main

Windsor Farms

As needed

As needed

107 Tonbridge Road

Gas services

Windsor Farms

As needed

As needed

Windsor Way betw Penhurst and Canterbury

Paving

Windsor Farms

As needed

As needed

Windsor Way at Cambridge

Paving

Windsor Farms

As needed

As needed


Second District

Location

Work

Area Impacted

Traffic Control

Days Closed

Brook at Marshall

Water main

Chamberlayne Industrial Center

As needed

As needed

800 blk W Leigh St

Gas services

Carver

As needed

As needed

Kinney St at W Leigh

Services

Carver

As needed

As needed

1513 Grove Ave

Chorinate

The Fan

As needed

Started May 20, 2021


Third District

Location

Work

Area Impacted

Traffic Control

Days Closed

None known

 

 

 

 


Fourth District

Location

Work

Area Impacted

Traffic Control

Days Closed

7000 blk Forest Hill Ave

Sewer replacement

Gravel Hill

Eastbound and westbound traffic reduced to one lane each way

60 days

 

Fifth District

Location

Work

Area Impacted

Traffic Control

Days Closed

W 25th betw Semmes and Riverside

Paving

Woodland Park

As needed

As needed

606 W 26th St

Meter relocation, services

Woodland Park

As needed

As needed

E 32nd St at Lawson

Gas main

Swansboro West

As needed

As needed

W 28th at Semmes

Saw cutting

Woodland Park

As needed

As needed


Sixth District

Location

Work

Area Impacted

Traffic Control

Days Closed

Brander Street floodwall

Floodwall testing

Brander St entrance to Wastewater Plant and Ancarrow’s Boat Ramp

As needed, follow detours

Tuesday, June 1

7 am to 4 pm

S 12th at E Byrd

Floodwall testing

E Byrd St betw S 12th and Virginia St

As needed, follow detours

Wednesday, June 2

7 am to 4 pm

Goodes St off Commerce Road

Floodwall testing

Manchester

As needed, follow detours

Thursday, June 4

7 am to 4 pm

Mayo Bridge

Floodwall testing

Old Town Manchester, Shockoe Bottom

Bridge closed, southbound end open to island

Saturday, June 5, 7 am to 4 pm

Mayo Bridge

Floodwall testing

Old Town Manchester, Shockoe Bottom

Bridge closed, northbound end open to island

Sunday, June 6, 7 am to 4 pm


Seventh District

Location

Work

Area Impacted

Traffic Control

Days Closed

Dock Street betw 18th and 21st

Floodwall testing

Shockoe Bottom,

As needed, follow detours

Wednesday, June 2

7 am to 4 pm

21st St at Cary

Floodwall testing

E Cary betw S 20th and S 22nd, Shockoe Bottom, Holocaust Museum

As needed, follow detours

Friday, June 4

7 am to 4 pm

2400 Venable St

Cleanout installation

Fairmount

Lane closures

Tuesday


Eighth District

Location

Work

Area Impacted

Traffic Control

Days Closed

1000 blk E 16th Street

Wastewater

Manchester

Closed during the day

All week


Ninth District

Location

Work

Area Impacted

Traffic Control

Days Closed

Blakemore Road

asphalt

Worthington Farms

As needed

Started March 23, 2021

5100 blk Snead Road

Gas services

Piney Knolls

As needed

As needed