Monday, May 9, 2022

Public Utilities Street Work for Week of May 9, 2022

 

DPU Street Work Week of May 9, 2022

*Completion estimates and closings are weather permitting

For emergency closings and daily locations, follow @DPUstreetnews on Twitter

First District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Radford Ave betw Staples Mill and Chantilly St

Gas main

Monument Ave Park

As needed

As needed

4600 blk Radford Ave

Restoration work

Monument Ave Park

As needed

As needed

4014 and 4212 Augusta Ave

Sewer replacements

Sauer’s Garden

Block closed during the day

85% complete, closed all week

Intersection of N Wilton at Matoaka Road

Drainage improvements

Westhampton

As needed

As needed

 

Second District

Location

Work

Area Impacted

Traffic Control

Days Closed*

1107-1125 Grove Ave

Sewer service replacements

VCU, The Fan

As needed

15% complete

900 blk W Clay St

Gas services

Carver

As needed

As needed

400 N Madison St

Sewer mainline repair

Jackson Ward

As needed

82% complete

Catherine St at N Harrison

Gas main

Carver

As needed

As needed

6 W Jackson St

Sewer service replacement

Jackson Ward

As needed

20% complete


Third District

Location

Work

Area Impacted

Traffic Control

Days Closed*

3000-3100 blks Woodrow Ave

Sewer main construction in alley

Brookland Park

Eastside alley closed

15 days

3860 Fauquier Ave

Pipe installation and back area grade stone in alley

Bellevue

As needed

80% complete

3015 Garland Ave

Sewer service

Brookland Park

As needed

95% complete

3600 Noble Ave

Sewer service replacement

Ginter Park

As needed

90% complete

2511 N Lombardy St

Gas renewal line services

Virginia Union

As needed

As needed


Fourth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Blakemore Road at Glencover

Water tie-in, services

Westlake Hills

As needed

As needed

3016 Wighton Drive

Sewer service replacement

Huguenot

As needed

85% complete

4019 Monticello St

Sewer service replacement

Bellevue

As needed

90% complete

5000, 5204 Devonshire Road

Sewer service replacements and mainline repair

Westover Hills

As needed

One service repair and 50% of mainline point repairs left

 

Fifth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

59 W Pilkington St

Milling, paving, topsoil installation

Swansboro

As needed

90% complete

3314 W Cary St

Sewer replacement

Carytown

As needed

45% complete

W 28th, W 29th, W 30th

Paving around area

Woodland Heights

As needed

As needed

601 W 30th

Gas services

Woodland Heights

As needed

As needed

2904 Springhill Ave

Gas services

Woodland Heights

As needed

As needed

 

Sixth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

200 blk N 9th St

Manhole rehab

Capitol Square

As needed

65% complete

 

Seventh District

Location

Work

Area Impacted

Traffic Control

Days Closed*

1509 E Main St

Exploratory dig

Shockoe Slip

As needed

70% complete

1410 N 32nd St

Mainline point repair and sewer service replacement

Church Hill North

As needed

Lateral repair complete, 90% of mainline point repair

1700 blk N 21st St

Wastewater

Peter Paul

Closed during day

All week

1300 blk N 22nd St

Wastewater

Fairmount, Chaffin’s Bluff

Closed during the day

All week

Q St at N 30th

Gas main

Church Hill North

As needed

As needed

 

Eighth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Gunn St

Water main

Bellmeade

As needed

As needed


Ninth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Montague Road

Water flushing

Worthington Farms

As needed

As needed

Clearfield St at Snead Road

Gas main

Piney Knolls

As needed

As needed

 

Friday, May 6, 2022

Lane Closure – Piney Knoll Area

 

Traffic Advisory
Department of Public Works

Providing a clean, safe and healthy environment

 

 

 

Richmond, Virginia
The Honorable Mayor Levar M. Stoney

cid:image002.gif@01CDF4C1.68BD8A10                                                                                                                                                     

For Immediate Release

May 6, 2022

Media Contact:
Paige Hairston – 804-646-3659 (Office)

                            804-385-0409 (Cell) 

 

 

                                          Lane Closure – Piney Knoll Area  

WHO:  City of Richmond Department of Public Works (https://twitter.com/DPW_RichmondVA) 
 
WHAT:  Lane Closure
 
WHEN:  Monday, May 9 through Friday, June 3 from 9 a.m. to 9 p.m.

WHERE:  The following streets in the 9th voter district:

·         Clayton Drive between Broad Rock Blvd and the dead end

·         Snead Court between Snead Road and the dead end

·         Pauls Lane between Snead Road and the dead end

·         White Oak Lane between Brinkwood Drive and the dead end

·         Brinkwood Drive between White Oak Drive and Orcutt Lane

·         Burtwood Lane between the dead end and the dead end

·         Crumpton Drive between Burtwood Drive and the dead end

·         Crumpton Drive Fork between the dead end and the dead end

·         Clearfield Street between Orcutt Lane and Walmsley Blvd

·         Sara Lane between Orcutt Lane and the dead end

·         Adler Road between Hey Road and Huth Road

·         Huth Road between Kendall Road and the dead end

·         Kendall Road between Snead Road and the dead end

·         Bertram Road between Walmsley Blvd and the dead end

·         McLeod Road between Kendall Road and Hansdale Road

·         Stacie Road between Kendall Road and Hansdale Road

·         Laporte Road between Stacie Road and the dead end

·         Hansdale Road between Matisse Lane and the dead end

·         Matisse Lane between Walmsley Blvd and the dead end

·         Monet Court between Walmsley Blvd and the dead end

·         Blendwell Road between Hey Road and Walmsley Blvd

BACKGROUND:  There will be alternating lane closures for paving (heat scarification and slurry).       

###

 

The City of Richmond Department of Public Works (DPW) is one of only 178 currently accredited public works agencies in the United States. DPW’s portfolio comprises a wide array of services to include leaf collection; street, sidewalk and alley maintenance; trash collection; recycling; grass cutting;  graffiti removal; parking enforcement; urban forestry; street signs; traffic signals and pavement markings and civil engineering. In addition, DPW maintains upkeep on most city buildings; issues permits for working in the city’s right-of-way; manages the RVA Bike Share program and maintains the fleet of city vehicles. DPW’s operating budget comes from the general fund of the City of Richmond.  For more information about DPW services, click here or call 3-1-1