Thursday, June 30, 2022

Street Closure - Commerce Road (two turn lanes) going north toward Bells Road

 

Traffic Advisory
Department of Public Works

Providing a clean, safe and healthy environment

 

 

 

Richmond, Virginia
The Honorable Mayor Levar M. Stoney

cid:image002.gif@01CDF4C1.68BD8A10                                                                                                                                                     

For Immediate Release

June 30, 2022

Media Contact:
Paige Hairston – 804-646-3659 (Office)

                            804-385-0409 (Cell) 

 

 

                                          Street Closure – Commerce Road  

WHO:  City of Richmond Department of Public Works (https://twitter.com/DPW_RichmondVA) 
 
WHAT:  Street Closure
 
WHEN:  Tuesday, July 5 through Friday, July 15

WHERE: Commerce Road (two turn lanes) going north toward Bells Road (in the 8th voter district

BACKGROUND:  The two turn lanes will be closed to repair the road. The thru lanes will remain open.       

###

 

The City of Richmond Department of Public Works (DPW) is one of only 195 currently accredited public works agencies in the United States. DPW’s portfolio comprises a wide array of services to include leaf collection; street, sidewalk and alley maintenance; trash collection; recycling; grass cutting;  graffiti removal; parking enforcement; urban forestry; street signs; traffic signals and pavement markings and civil engineering. In addition, DPW maintains upkeep on most city buildings; issues permits for working in the city’s right-of-way; manages the RVA Bike Share program and maintains the fleet of city vehicles. DPW’s operating budget comes from the general fund of the City of Richmond.  For more information about DPW services, click here or call 3-1-1

Monday, June 27, 2022

Street Closure – North 8th Street

 

Traffic Advisory
Department of Public Works

Providing a clean, safe and healthy environment

 

 

 

Richmond, Virginia
The Honorable Mayor Levar M. Stoney

cid:image002.gif@01CDF4C1.68BD8A10                                                                                                                                                     

For Immediate Release

June 27, 2022

Media Contact:
Paige Hairston – 804-646-3659 (Office)

                            804-385-0409 (Cell) 

 

 

                                                  Street Closure – North 8th Street

WHO:  City of Richmond Department of Public Works (https://twitter.com/DPW_RichmondVA) 
 
WHAT:  Street Closure
 
WHEN:  Starting at Noon on Friday, July 1 and ending at Noon on Sunday, July 3

WHERE:  North 8th Street between East Broad and East Franklin streets (in the 6th voter district)

BACKGROUND:  The area will be closed to set up a crane to remove the tower crane at 200 North 9th Street.

 

Note: Flaggers will maintain thru traffic on East Grace (westbound - across the intersection of North 8th Street) and they will also provide access for parking at Saint Peter's Church.

 

Please follow the detour signs.      

###

 

The City of Richmond Department of Public Works (DPW) is one of only 195 currently accredited public works agencies in the United States. DPW’s portfolio comprises a wide array of services to include leaf collection; street, sidewalk and alley maintenance; trash collection; recycling; grass cutting;  graffiti removal; parking enforcement; urban forestry; street signs; traffic signals and pavement markings and civil engineering. In addition, DPW maintains upkeep on most city buildings; issues permits for working in the city’s right-of-way; manages the RVA Bike Share program and maintains the fleet of city vehicles. DPW’s operating budget comes from the general fund of the City of Richmond.  For more information about DPW services, click here or call 3-1-1

Public Utilities Street Work for Week of June 27, 2022

 

First District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Intersection of N Wilton at Matoaka Road

Drainage improvements

Westhampton

As needed

10% complete

304 Seneca Road

Milling and paving

Westhampton

As needed

90% complete

3900 blk Exeter Road

Sewer mainline replacement

Windsor Farms

As needed

80% complete

Radford Ave betw Westmoreland and Staples Mill

Paving

Monument Ave Park

As needed

As needed

Tomacee Road at Banbury

Gas main

Windsor Farms

As needed

As needed

 

Second District

Location

Work

Area Impacted

Traffic Control

Days Closed*

400 N Madison St

Sewer mainline repair

Jackson Ward

As needed

82% complete

W Clay at Hanock

paving

Carver

As needed

As needed

Pulliam Street

asphalt

Jackson Ward

As needed

As needed

3208 Monument Ave

Sewer service replacement

Museum District

Alley

90% complete

2618 W Main St

Sewer service replacement

Fan District

As needed

25% complete

W Clay at Goshen

testing

Carver

As needed

As needed


Third District

Location

Work

Area Impacted

Traffic Control

Days Closed*

911 N 2nd St

Sewer service replacement

Gilpin, borders on 6th District

As needed

95% complete

Tazwell St

Gas main renewal

Northern Barton Heights

As needed

As needed

300 Overbrook Road

Concrete and restoration

Northern Barton Heights

As needed

As needed

3rd St at Chestnut

Gas main

Southern Barton Heights

As needed

As needed


Fourth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Hagueman Road

Water services

Westlake Hills

As needed

As needed

5200 blk Devonshire Road

Milling and paving

Westover Hills

As needed

90% complete

9524, 9516 Fernleigh Drive

Drainage improvements

Huguenot

As needed

10% complete

9501 Fernleigh Drive

Cavitation repairs

Huguenot

As needed

Scheduled to start

Glencove Lane

Asphalt, water main

Westlake Hills

As needed

As needed

 

Fifth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

None

 

 

 

 

 

Sixth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

N 9th St between E Broad and E Grace

Building construction, asphalt, clean up, hydrant removal

Capitol District

Closed

Until October 2022

Oliver Hill Way

Saw cutting

Mosby Court

As needed

As needed

3018 Letcher Ave

Sewer service replacement

Highland Terrace

As needed

75% complete

 

Seventh District

Location

Work

Area Impacted

Traffic Control

Days Closed*

500-700 blks N 26th St

Milling and paving

Church Hill

As needed

90% complete

1108 N 32nd St

Sewer service replacement

Oakwood

As needed

45% complete

802 N 25th St

Sewer service replacement

Church Hill

As needed

80% complete

2306 Jefferson Ave

Sewer service replacement

Union Hill

As needed

30% complete

1415 National St

Sewer service replacement

Montrose Heights, Fulton

As needed

25% complete

2700 blk Selden St

Gas services

Creighton

As needed

As needed

N 28th at Kane St

Paving

Creighton

As needed

As needed


Eighth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Gunn St

Water main

Bellmeade

As needed

As needed

2401 Dale Ave

Milling and paving

Davee Gardens

As needed

90% complete

Goolsby Ave

Asphalt

Bensley

As needed

As needed

Transport St

Gas main renewal

Parnell Industrial

As needed

As needed


Ninth District

Location

Work

Area Impacted

Traffic Control

Days Closed*

Clearfield at Kendall

Gas testing

Piney Knolls

As needed

As needed

Clisby Road

Water main testing

Worthington Farms

As needed

As needed

Whitehead Road

Gas main

Worthington Farms

As needed

As needed